Lampton Road Civic Centre Site, London Borough of Hounslow

Lampton Road Civic Centre Site, London Borough of Hounslow

The challenge

SYSTRA has supported Notting Hill Housing since 2015 in relation to a hybrid planning application concerning the demolition of the old Hounslow Civic Centre and the construction of 940 residential dwellings on the former civic centre site known as Lampton Road, including car parking spaces, public space, landscaping and associated works.

SYSTRA’s Role

SYSTRA collaborated closely with Allies and Morrison architects, producing a Transport Assessment, draft Travel Plan and provided transport input for the Environmental Statement for the Outline and Detailed portions of the planning application.

The hybrid application was granted planning permission in July 2016 and Phase 1 is currently under construction. SYSTRA continues to work with the appointed main contractor in connection with the Section 38 and Section 278 approvals processes for highway works.

SYSTRA was subsequently retained as transport consultant for Phase 2 of the scheme, which involved preparing a Transport Statement, Access Statement, Construction Management Plan and transport input to the Environmental Compliance Report. SYSTRA also produced commentary explaining how the Outline Travel Plan, approved as part of the hybrid application, would be implemented for Phase 2 of the development.

Top of the page
SYSTRA Ltd Registered office: 3rd Floor 5 Old Bailey, London, England, EC4M 7BA. Registered Number 3383212
Contact